Cautiones pro installation of apparatus hamo test genus, et vento urente, iecit a machineï¼ ï¼
- 2021-06-03-
Quodhamo genus iecit inspiratione machinaest plerumque maior species et apparatu installation processus est relative magis complicated quam parvum. Rectam institutionem et apparatus sunt key test sunt normalis operatio est ensuring ut postea apparatu. Primo rudes in operationibus users personas pertinet vel requiruntur ad mandatis stricte sequi praecepta. Alienum facile potest facere operationem in immedicabile damnum corruissenthamo iecit inspiratione machina. Quodshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. Quodhamo genus iecit inspiratione machina is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Quodprecautions for the installation and debugging of the relevant components are introduced below.
1. iaculat inspiratione fabrica:
Quodshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Vide Cor Meum, et stupra TRADUCTOR:
Prius de nulla onere test inspiciant an hoisting situlae et gyros gramina currunt recta via et obstringere lumbare ad Levabit in mediocri intentione propter obliquum et exequi onere test sisto et ablata facultatem operandi, sive sit rerum tactis, sonitus et vibrationis, reprehendo, et impediunt.
3. diripio, separator harenae;
Primum reprehendo utrum motus arietem flexuosa et compesce proprium locum separatum argentum cumque Vide oneratur et debugged est continuus influxus ferro ictus et inspiciant an ferro ictus itenim atque proni cum RECUMBO emittitur